Securing operational technology for an offshore wind farm
Seatrium, appointed as the Engineering Prime Contractor to build the Offshore Substation of an offshore wind farm project in East Asia, required specialised Operational Technology Security (OTS) expertise. NCS was engaged to provide consultancy to Seatrium, the wind farm owner, and multiple systems suppliers. The NCS team ensured compliance requirements were met, OTS objectives achieved, and hundreds of deliverables developed. Leveraging extensive experience in managing complex projects and certified engineering competencies, NCS delivered the scope seamlessly, despite the project’s scale and intricacy, involving multiple systems, vendors, and workstreams. The successful OTS delivery contributed to the Offshore Substation (OSS) project’s on-time, on-budget completion with NCS’ professionalism and expertise earning stakeholder trust, commendations, and strengthening the end customer’s confidence in Seatrium.
Key takeaways
- Complemented industry leaders in delivering OT security for a large-scale offshore project
- Navigated complex systems and workstreams through strong engineering expertise
- Ensured compliance with global OTS standards (ISA/IEC 62443)
- Delivered on-time and on-budget, strengthening end-customer confidence
The challenge
Seatrium, a leading offshore engineering company and the Engineering Prime Contractor, required specialised Operational Technology Security (OTS) expertise for a mega project to build a new Offshore Substation – part of a globally sourced offshore wind farm in East Asia. With multiple systems, vendors, and concurrent workstreams, the project demanded expert advisory, careful navigation of complex interdependencies, and timely completion of the OTS workstream without disrupting the construction schedule. The team was also tasked with ensuring compliance with OTS requirements, including ISA/IEC 62443, local regulations, and organisational policies, while producing hundreds of deliverables such as plans, assessments, designs, policies, and manuals.
The solution
Leveraging deep OTS expertise, complex project experience, and certified engineering competencies, the NCS team collaborated closely with Seatrium, the wind farm owner, Original Equipment Manufacturers, and system integrators to ensure compliance and deliver on OTS objectives. The team developed management plans, provided subject matter advisory, bridged cross-disciplinary communication, and drove the development of critical OTS deliverables.
Snapshot of capabilities
- OTS Programme and Organisational Controls
- Systems Security Engineering and Management Planning
- Security Risk Assessments and Architecture Design
- Network Segmentation and Security Policies & Procedures
- Vulnerability Assessment, Security Integration & Validation
- Security Operations
The impact
The OTS workstream was delivered seamlessly with minimal rework, contributing to the Offshore Substation (OSS) project’s successful on-time, and on-budget completion. The NCS team also helped recover the schedule when delays threatened financial penalties. Their professionalism and expertise earned strong stakeholder trust, repeated commendations, and reinforced the end customer’s confidence in Seatrium.
“NCS supported the project with strong technical expertise to the OTS workstream and made significant contribution to the success of the project.”